مسؤول المنطقة (AAD)
عنوان الإعلان: Area Authority (AAD)
KBRالأسبوع الماضي
- الراتب
- غير معلن
- نوع الوظيفة
- دوام كامل
- الموقع
- البصرة
- آخر موعد
- 23 أيلول 2026
تعلن شركة KBR عن حاجتها إلى مسؤول منطقة (AAD) في البصرة لإدارة إجراءات ضبط العمل (CoW) وتقييم المخاطر واعتماد التصاريح وعزل الطاقة.
المهام
- Conduct a detailed discussion with the Performing Authority (PA) during the work planning stage to ensure all hazards are identified.
- Verify that an appropriately detailed Risk Assessment is completed to reduce risks to an acceptable level (ALARP).
- Ensure the quality of the CoW documentation by checking that the content is accurate and supplementary certificates are approved and attached.
- Visit the worksite with the PA to prepare the Hazard Identification and Risk Assessment (HITRA), ensuring the PA understands the location, equipment, activities, hazards, and related controls.
- Attend the worksite on the initial issue of the permit, participate in toolbox talks, and authorize the work to start.
- Perform regular monitoring checks during each shift, particularly within the first hour of the permit's issuance.
- Approve the design of energy isolation and oversee the implementation of energy isolation measures prior to the issuance of work permits.
- Confirm that energy isolation is in place before task initiation and demonstrate the isolation to the PA.
- Confirm positive isolation for Hot Work,, and Confined Space Entry tasks.
- Liaise with the station SAEP to ensure that all work with electrical content is reviewed, and all associated electrical certificates and risk assessments are in place.
- Authorises sanction to test on agreed isolations and points Maintains station isolation register, monitoring work scopes and removing isolation when required or transferring to LTI.
- Close permits by signing to confirm that work is completed, ensuring that the worksite is left safe, clean, and tidy.
- Ensure that energy isolation is removed after work completion and the cancellation of the permit.
- Conduct a thorough handover regarding ongoing tasks during shift changes with the oncoming AA, ensuring continuity and safety.
- Ensure that work can proceed safely with no significant impact from or to SIMOPS.
- Attend daily permit/SIMOPS meetings to provide detailed work scopes to support the Site Manager (SM).
- Capture any lessons learned from the CoW process within WorkSafe and conduct self-verification audits.
المهارات
- تقييم المخاطر
- تحديد المخاطر
- تصريح العمل (PTW)
- عزل الطاقة
- SIMOPS
التفاصيل
- المهنة
- مسؤول السلامة والصحة المهنية والبيئة
- الفئة
- الهندسة